ABOUT US
PT TRIPANDAWA SAKTI is a leading company specializing in technical inspection, testing, certification, calibration and inspection services. Founded in 2013, we are committed to providing reliable and accurate solutions to ensure the quality, safety and compliance of industrial products and systems.
1. Executive Summary:
We are Qualified Inspection Company, that legitimated by BAPETEN and Certified by Level 3.
2. Introduction:
2.1 Purpose
The inspection, testing and treatment to verify and validate the material integrity through NDT (non-Destructive test), DT (Destructive testing), assessment and Heat treatment.
2.2. Scope
2.2.1 NDT test such as,
1. Radiography (RT)
2. Ultrasonic test (UT)
3. Magnetic test (MT)
4. Penetrant Test (PT)
5. Positive Material Identification (PMI)
6. Phased Array Test (PAUT)
7. Eddy Current Test (ECT)
8. Borescope Inspection
9. Hardness test
10. IRIS Inspection
11. Corrosion Under Insulation.
12. Drone Inspection.
13. Oxide Scale Detection (OSD)
14. Vacuum Test (VT)
2.2.2 Destructive Test
1. Tensile Test
2. Bending test
3. Metallurgical test
4. Welder Test
2.2.3 Treatment
1. PWHT (post weld Heat treatment)
2. Preheat
2.2.4 Assessment and Inspection
1. Boiler Assessment
2. Remaining Life Assessment
3. Tank Inspection
3. Documentation & Compliance Review
3.1 Certification Verification
1. ISO 9001; Quality Management System
2. ISO 14001; Environmental management System
3. ISO 45001; Occupational Health and safety management system
3.2 Safety Records Assessment
3.2.1 Near Miss, Incident Investigation
3.3 Regulatory Compliance
4. Technical Capability Assessment
4.1 Review of Contractor Experience
PT Tri Pandawa Sakti was established by 2013, and we have comprehensive experiences for the Construction and Maintenance services.
4.2 Equipment and Tools Readiness
In ensuring the work activities are conducted as intended result, the measurement tools and equipment shall be in fit condition by maintaining the tools and equipment as prudent practice, Tools equipment
4.3 Method Statements and Procedures
Our services for inspection, testing and treatment have been standardized into common engineering practice and international standards, and some services have been authorized by Level 3 and government agency.
4.4 Quality Assurance and Testing Plans
PT Tri Pandawa Sakti has been certified ISO 9001, and our Quality management system has adopted the Quality Approach (Plan, Do, Check, Act), Quality Plan.
5. Personnel Qualification
5.1 Importance of Qualified Personnel
As required all the inspection, testing and treatment shall be conducted by qualified and certified personnel.
5.2 Training Records
To encourage personnel competency, we have implemented resources development system.
5.3 Manpower Mobilization Plan
To ensure adequacy manpower to complete the work in time and prudent manner, provider the manpower mobilization plan as.
6. Risk Management
6.1 Risk Assessment
To control any uncertain intended effect, we have established comprehensive and systematic Risk management system. Adopting the ISO 31000 and implementing Hazard Identification risk assessment and determining control (HIRADC)
6.2 Emergency Response Planning
outlines procedures to protect people, property, and operations during crises—whether natural disasters, workplace accidents, security threats, or other emergencies.
6.3 Safety Communication
process of sharing information about hazards, risks, safety procedures, and controls with all personnel in the workplace. The goal is to reduce accidents by ensuring workers understand the risks they face and know how to work safely by toolbox talk.
6.4 Environmental and Sustainability
To minimize ecological impact, conserve resources, and support long-term planetary health, hazardous material management.
7. Quality Assurance Readiness
7.1 Traceability Systems
all information about a material identification throughout its Unique numbering of recorded identifications, it enables organizations to track and trace status.
7.2 Calibration Certificates
Measurement Tools and equipment shall be functioned and verified by Calibration certificate.
7.3 NCR Handling
Any in-compliances shall be taken it action in timely manner, either correction, segregation or elimination the defect. And it will be communicated to Client properly.
7.4 QAQC Check points (ITP)
The inspection sequence shall be plan; ITP should be monitor and communicate to client.
8. Schedule & Planning
8.1 Schedule Execution
In Accordance with the Work Scope, detail work schedule will be provided such as preparation, Implementation, Monitoring and documentation through S-Curve Monitoring.
8.2 Milestones and Critical Path
Detail Milestones and Critical Path will be identified into work schedule and S-Curve Monitoring.
8.3 Contingency Planning
process of preparing for potential future events or circumstances that could disrupt normal operations. It involves identifying risks, developing response strategies, and creating actionable plans to ensure continuity and resilience.
1. Risk Assessment: Identifying potential threats (natural disasters, cyberattacks, supply chain disruptions, etc.)
2. Business Impact Analysis: Determining which functions are critical and the consequences of disruption
3. Response Strategies: Developing specific actions for different scenarios
4. Communication Plans: Establishing protocols for internal/external stakeholder communication
5. Resource Allocation: Ensuring personnel, technology, and supplies are available during crises
6. Testing & Training: Regularly exercising plans through drills and updating based on lessons learned
9.Communication & Reporting
9.1 Progress Reporting
For day today progress will be communicated to client through WA group and if any major finding will be communicated immediately. In addition, for prudent monitoring update S-curve monitoring (as required)
9.2 QA/QC Reporting Structure
Result of Inspection and testing will be recorded and analyse through standard and approved procedure. Record form exists into Respective operational Procedure.
9.3 Coordination Protocols
For sound work process and smooth communication, we have provided Organization chart.
Vision
Become a trusted partner in the inspection and certification industry by providing innovative and high-quality services to support the safety and operational efficiency of our clients.
Mission
Providing the best inspection, testing, certification, calibration and inspection services through technical expertise, advanced technology and commitment to high quality standards.
PT Tri Pandawa Sakti is also very committed to:
1. Continously Development the inspector.
2. Adoption the new technology
3. Provide the best quality in every job carried out.
COMPANY EXPERIENCE


BUSINESS MODEL CANVAS


CUSTOMER RELATION
Client specification is our basic guideline to earn quality Products. Free consultation during and after sales service.
CUSTOMER SEGMENT
Project of Industrial Company including Power Plant, Petrochemical, Pipe Line, Offshore Plant, Shipp Manufacturing, Fabrication Company.
VALUE PROPOSITION
Quality is our path, recognizing international standard requirements. Fulfill all Government Regulations. Fulfill all client quality requirement systems. Free Consultation.
REVENUE STREAM
Service is free from inspection and testing service.
CONTACT US
For further information regarding engineering inspection services and engineering equipment certification, please contact us via the contact below.
Phone
Head Office (0254) 7851979 Handphone +6287858503986


Gallery
Portofolio
Article
NDT, Non-Destructive Test
Radiography
Ultrasonic Test
Magnetic Particle
Penetrant Test
Phase Array Ultrasonic Test
Eddy Current Test
Boiler tube Oxide scale Inspection
In-situ Replica metallography
Heat Treatment
Condition Monitoring
Others testing, Inspection and Analysis
DT, Destructive
© 2024. All rights reserved.
PT TRI PANDAWA SAKTI
Kim.01, jln. Klejet kertasana, RT/RW. 006/003,
kampung-kubang gede, kel. Mangkunegara,
Kec. Bojonegara, Kab. Serang- Banten. 42454
Branch Office Batam
Kawasan Buana Central Park
Komplek Jefferson no. 40, RT. 005 / RW.001
Kecamatan Batu Aji, Kelurahan Kibing
Batam 29422 - Kep. Riau
PWHT
Preheat
Hardness Test
RCFA-Root Cause Failure Analysis
FFS - Remaining life Assessment
CUI- Corrosion Under Insulation
Vibration Monitoring
Rope access inspection
Drone Inspection
Hydro Test
Vacuum Test
Welding Inspection
Equipment, Instrument Calibration & Certification
PMI - Positive Material Identification
Tank Inspection, Assessment and RLA
Corrosion Under Insulation
Pipe Stress analysis
Geotextile Test
Tensile Test
Bending Test
Head Office